Västerås Steam Power Plantboiling point turning cold
|
|
|
|
Boiler 15 Constructed in 1959 and the last of the boilers to be installed. Published in the April edition of Appeal magazine's feature on abandoned places. |
ASKA © 1999-2010 Björn Sahlberg / About / Some rights reserved